Set the layout and dimensions

Provide floor plans, room height, wall-to-wall dimensions, door openings and site photographs. Identify where the system connects to floors, ceilings and existing walls. Final dimensions should follow a site survey.

Choose the desired configuration

Discuss single or double glazing, doors, blinds and privacy glass where appropriate. Available models, hardware interfaces and electrical needs must be confirmed with the supplier.

Specify acoustic and safety requirements

State the project’s target acoustic performance and applicable glass-safety requirements, then request evidence for the complete proposed assembly. Do not assume an acoustic value from glass thickness alone.

Coordinate installation

Clarify delivery access, installation responsibility, floor and ceiling tolerances, finish samples and maintenance. Project and product specifications remain to be confirmed. Explore partition systems.